Gołymin-Center - ul. Maple

Gołymin-Center - ul. Maple

Our next installation was built in the town of Gołymin-O Ośrodek. Mr. Daniel decided to install a 3.2 kWp installation.
Implementation description!

Installation 3.2 kWp

Mr. Daniel came to us to design and build a photovoltaic installation for him. The purpose of the installation was purely economic - to reduce electricity bills to zero and enjoy low building operating costs.
After performing the audit and simulating yields, we selected a 3.2 kWp installation for Mr. Daniel.
We also proposed the selection of system components in such a way that in the future it would be possible to increase the power of the system at a low cost.
Daniel's building was a dream building for every installer. It took us 1 day to complete the aesthetically pleasing and safe installation.
Today, Mr. Daniel is waiting for the first bill, which will amount to PLN 7/month, and he watches the amount of energy produced via a mobile application.

Client: Mr. Daniel
Location: Gołymin-Center, Masovian Voivodeship
Services:  Photovoltaic installation

Power

3.2 KWp

Annual yield

2,987 kWh

Annual profit

PLN 2,090

Modules

SunLink

Inverter

SofaSolar

Send us a message and get a free simulation.

Tell us what your energy needs are and let us choose the perfect installation for your needs.

We offer products and services of the highest quality. Our assembly warranty is 5 years. We maintain and monitor our installations throughout their operation. With us you don't have to worry about anything, after the installation we will take care of all the formalities for you.

note icon

Please contact us and we will respond within 3-5 days. Or call our experts directly: +48 518 154 861

    check the price

    Contact us and we will prepare a free yield simulation and an individual offer for you.

    en_GBEnglish (UK)