Grudusk - ul. Ciechanowska

Grudusk - ul. Ciechanowska

Our next installation was built in Grudusk. Mr. Szymon decided to install a 6.75 kWp installation.
Implementation description!

Installation 6.75 kWp

Mr. Szymon's bills showed a consumption of 4,436 kWh per year. In the pessimistic case, assuming zero auto-consumption, the installation must produce 4,436 / 0.8 = 5,545 kWh of energy to cover the demand for electricity.
We selected a 6.75 kWp installation consisting of 18 SunLink 375Wp panels and a Sofar Solar 6.6 KTL-X inverter, generating 5,955 kWh per year. In this way, the investor will have quite a decent surplus of energy, which he can manage freely.
 
Why Sofar? Find out more in this article: https://enerp.pl/sofar-huawei-recenzja-cena/

Client: Mr. Simon
Location: Grudusk, Masovian Voivodeship
Services:  Photovoltaic installation

Power

6.75 KWp

Annual yield

5,955 kWh

Annual profit

PLN 4,168

Modules

SunLink

Inverter

SofaSolar

Send us a message and get a free simulation.

Tell us what your energy needs are and let us choose the perfect installation for your needs.

We offer products and services of the highest quality. Our assembly warranty is 5 years. We maintain and monitor our installations throughout their operation. With us you don't have to worry about anything, after the installation we will take care of all the formalities for you.

note icon

Please contact us and we will respond within 3-5 days. Or call our experts directly: +48 518 154 861

    check the price

    Contact us and we will prepare a free yield simulation and an individual offer for you.

    en_GBEnglish (UK)